Final foundation video of what Barefoot Builders have done up to now. Plumbing roughed in, driveway ramp for garage, beginning of exterior staircase, patio stairs, anti-seismic deep foundation, horizontal vegas, poured floor, sunken bathroom, caja de registro, two tank septic system, four tube manifold 6mt each leech field, domestic water systems (i.e. well and holding […]

David’s Q & A’s

A video answer session for David’s questions regarding his foundation on his property in Playa Gigante, Nicaragua.

Prana del Sol Phase 2 Complete

A video showing the finished product of the gutters on the Northeast road of the Prana del Sol development in Playa Gigante, Nicaragua

Contractor Consulting for Marc

Benny goes over some issues caused by the former General contractor for Marc’s house. Barefoot Builders was hired to build a beautiful blue stone wall lining the entry drive way of Marc’s previously built house.

Best fried chicken in Nica

A short video with Benny Love telling us where to find the best fried chicken in Nicaragua!

Prana del Sol Phase 2

A video overview of the second phase of road work done in the Prana del Sol development in Playa Gigante, Nicaragua. The Northeast road had been severely corroded by rain so the Barefoot Builders crew installed gutters along the south side of almost the entire road.

David’s Pre-foundation pour

An overview video of the build so far, and where the foundation will lie with images of the pre construction work such as rebar columns and forms and a display of all the building materials necessary to get started.  

David’s house placement

A video description of David’s property with placement ideals for his self designed house and bodega (storage shed) after the initial infrastructure is set. David’s house is located in Playa Gigante, Nicaragua about a five minute walk from the beach and surf.

Pepe’s Horse Shelter

 

Foundation Check